Current Project List - Design 60%
- 4TH_ST and Plateau 60% Plan Drawings
- W 13th Street_01-22-ST-99_60% Plans
- E 39th St Drainage Park to Riddick 60% Plans
- Adell Dr Drainage 05-20-DR-108 60_ Combined Plans
- Arthur Lane Reconstruction 06-18-ST-B104 60% Plan Submittal
- Bridgeport
- Broadway Drainage 01-22-DR-181 60% Plan Drawings
- Chenal Blvd at Gamble Intersection 60% Plans
- Chenal blvd at Chenal Club Signal 60% Plans
- Cherrybark 60 Percent Construction Plans r1
- Durwood Rd at Brownwood Rd Drainage 03-22-DR-32 60% Drawings
- Dorchester Dr Drainage 06-22-DR-004 60% Plan Submittal
- Irish Rose 60% Drawing Plans
- Jonesboro Dr. Children's Trail (Little Rock) 60% Plan Drawings
- Kirk at Wellington 60% Submittal
- Pine Summit Court Drainage R6.5 Internal Check
- Rinke Road
- River Trail Connector 60%
- SHACKELFORD DRAINAGE 60% PLANS #06-22-DR-158
- S Shackleford at col glenn intersection 07-19-TS-232 60% Plans - HALF SIZE
- TAYLOR LOOP CREEK DRAINAGE 05-22-DR-36 60% PLANS
- Valley Drive Drainage Improvements 02-20-ST-171 60% Plan Drawings
- Vimy Ridge Rd Plans 60%
- Windsor Drive - Brookview Drive Drainage 07-22-DR-212 Revised Submittal Plans