- 06-17-ST-267 54616.006-KANIS-JOHN_BARROW-SHEET_SET-06-13-2025
- Job 061839 Pearl Ave. – S. Martin Impvts. (Markham St.) (Little Rock) (S) 100% Plans_4-25-2025
- 061623 LR Central High Corridor PH 1 Trail Connector Jacobs
- River Trail Side 100%
- Rose Creek Trail Final Plans 5-15-2026
- Job-No.-061757-Jonesboro-Dr.-Childrens-Trail-Little-Rock-S-2025-10-14

- 03-17-DR-107_4TH_ST_FINAL_PLANS AS BID
- W. 24th St. Valmar St. to Valentine St. 01-17-ST-41 100% Drawings Bid Set
- 2025-11-05 – 36TH STREET SIDEWALK 100% PLANS AS BID
- East 39th St DRAINAGE 100% R1 6-26-2025 NC For Construction
- 2025-12-18 – 44TH STREET IMPROVEMENTS 100% PLANS AS BID
- AUTUMN ROAD WIDENING 04-22-ST-2DR 100% PLAN DRAWINGS 08.28.2024 Bid Set
- Bella Rosa Drive Bridge Replacement For Construction
- Broadway Drainage 01-22-DR-181 100% Plan Drawings Bid Set
- Event 2601 – Attachment B – Boyd Street Plans AS BID
- Chenal and Gamble Signal Plans For Construction
- City Hall Retaining Wall Repair AS BID
- Shackleford and Colonel Glenn intersection 100% plans For Construction
- Shackleford Breckenridge Sidewalk Repair 100% PLANS
- Ward 1, 3 & 7 Sidewalks – 100% Plan Drawings-R2 For Construction
- WARD 4 SIDEWALKS 100% PLANS For Construction
- Clinton Presidential Park Bridge Pier Protection